Skip to content
Networks & Infrastructure

Networks that stop being the thing everyone blames

LAN, WAN, Wi-Fi, structured cabling and servers: designed, documented and handed over

At a glance

Typical duration
A switch and Wi-Fi refresh takes under a week. New cabling across a multi-floor site, 3–8 weeks
Covers
6 areas
What changes
4 outcomes
First step
Paid discovery, credited
You receive
5 deliverables
What changes for you

Wi-Fi that works in the warehouse, not just near the office

  • A network diagram that matches reality
  • Failures that are isolated instead of taking the site down
  • Capacity headroom for the next three years, costed now
Scope

What is inside networks & infrastructure

01

Network design

LAN and WAN topology, VLAN segmentation, routing and QoS. Designed on paper and signed off before a single cable is pulled.

02

Structured cabling

Copper and fibre, labelled to standard, tested and certified. Patch panels and racks laid out so the next person can work in them.

03

Enterprise Wi-Fi

Predictive design then an on-site survey. Coverage measured in the aisles where the scanners are used, not from a floor plan.

04

Server rooms

Racks, power, UPS, cooling and physical access. The unglamorous foundation that determines whether everything above it stays up.

05

Segmentation and access

Guests, staff, cameras, machines and payment traffic separated properly, so one compromised device is not a free run at the ledger.

06

Monitoring and documentation

Live monitoring with alerting, plus as-built diagrams and an asset register handed over at the end, not promised.

How it runs

Four stages.
No surprises.

Networks & Infrastructure usually runs a switch and wi-fi refresh takes under a week. new cabling across a multi-floor site, 3–8 weeks.

01Discover1–3 days

We sit with the people who use the system, walk the site, and read the network. No proposal before we understand how the work is done today and where it breaks.

  • Discover

    1–3 days

    01

    Current-state map of systems and traffic

    Ranked list of what is costing you time or money

    A go / no-go recommendation, in writing

    For Networks & InfrastructureA site survey and network read: we map what is actually installed, find the bottlenecks, and give you a prioritised plan with costs.

  • Design

    2 days – 1 week

    02

    Solution architecture and integration plan

    Bill of materials with lead times

    Fixed-scope statement of work

  • Build & deploy

    3 days – 7 weeks

    03

    Working increments on anything that takes more than a fortnight

    Staged cutover with a tested rollback

    Handover documentation as it is built, not after

  • Run & improve

    Ongoing

    04

    Monitored uptime with agreed response times

    Quarterly review against the original goals

    Capacity and security roadmap, refreshed each quarter

How we design it

One uplink, one firewall, four segments that cannot see each other.

You get this drawing at handover — most companies have never been given one for their own building.

Site design

documented
Uplinkfibre + LTE failover
Firewalleverything passes through
Core switchstacked, redundant
  • Staff

    VLAN 10

    96 endpoints

  • Plant floor

    VLAN 20

    31 devices

  • Cameras

    VLAN 30

    48 channels

  • Guest Wi-Fi

    VLAN 40

    rate limited

a camera breach cannot reach the finance PCs

Why networks decay

Almost no network is badly designed on day one. They decay:

A department moves and someone drops in an unmanaged switch. A camera system goes in on the office VLAN because it was quicker. An access point gets added where there is a spare port rather than where the coverage gap is. Three years of that, and nobody can say with confidence what is plugged into what.

The result is a network where every problem takes a day to diagnose, because the first hour is spent working out how it is wired.

What we do about it

Read before you write

Every engagement starts with a survey: physical walk, switch port audit, traffic capture, Wi-Fi measurement. You get a picture of what is installed, which is reliably different from what people believe is installed.

Design on paper first

Topology, addressing, segmentation and QoS get decided and signed off before procurement. Changing a diagram costs nothing; changing a rack costs a weekend.

Segment properly

Production machines, cameras, guest Wi-Fi, staff and card payments each get their own segment, with rules between them. On most sites it removes more risk than anything else we could do, and it is mostly configuration, not hardware.

Measure the result

Wi-Fi coverage gets verified with a post-installation survey in the aisles where the work happens. Cable runs get tested and certified. Throughput gets proven against the numbers in the design. If it does not hit the spec, it is not finished.

Server rooms and power

A resilient network on unprotected power is not resilient. We size UPS capacity against measured load rather than nameplate ratings, plan cooling for the rack density you are building to, and put physical access control on the door.

The handover pack

The deliverables list above is not aspirational. It is what you receive, and it is what makes the difference between an estate you own and an estate that owns whoever installed it.

You receive

  • As-built network diagrams: logical and physical
  • Cable test certificates and labelling schedule
  • Device configuration backups and an IP address plan
  • Wi-Fi heat map from the post-installation survey
  • Monitoring dashboard with agreed alert thresholds

Who this is for

  • Plants where coverage or reliability is costing production time
  • Offices that have grown by adding switches to switches
  • Campuses and multi-floor buildings starting a fit-out
  • Anyone whose network diagram is a whiteboard photo from 2019

How it starts

A site survey and network read: we map what is actually installed, find the bottlenecks, and give you a prioritised plan with costs.

Start here
Questions

About networks & infrastructure

Yes, and it is how most of our infrastructure work is done. Changes are staged, scheduled into windows you approve, and every cutover has a tested rollback prepared before we start. If a step needs downtime we tell you the window and duration in advance.

Networks & Infrastructure

Ready when you are. Start with a conversation, not a contract.

A call, then a written recommendation. No obligation.

  • A reply within one working dayFrom an engineer.
  • We look before we quoteA call, and a site visit if needed.
  • The recommendation is yoursYours to take elsewhere.
  • Or call +20 109 777 8090