Network design
LAN and WAN topology, VLAN segmentation, routing and QoS. Designed on paper and signed off before a single cable is pulled.
LAN, WAN, Wi-Fi, structured cabling and servers: designed, documented and handed over
At a glance
Networks & Infrastructure usually runs a switch and wi-fi refresh takes under a week. new cabling across a multi-floor site, 3–8 weeks.
We sit with the people who use the system, walk the site, and read the network. No proposal before we understand how the work is done today and where it breaks.
Discover
1–3 days
Current-state map of systems and traffic
Ranked list of what is costing you time or money
A go / no-go recommendation, in writing
For Networks & InfrastructureA site survey and network read: we map what is actually installed, find the bottlenecks, and give you a prioritised plan with costs.
Design
2 days – 1 week
Solution architecture and integration plan
Bill of materials with lead times
Fixed-scope statement of work
Build & deploy
3 days – 7 weeks
Working increments on anything that takes more than a fortnight
Staged cutover with a tested rollback
Handover documentation as it is built, not after
Run & improve
Ongoing
Monitored uptime with agreed response times
Quarterly review against the original goals
Capacity and security roadmap, refreshed each quarter
You get this drawing at handover — most companies have never been given one for their own building.
Site design
documentedStaff
VLAN 10
96 endpoints
Plant floor
VLAN 20
31 devices
Cameras
VLAN 30
48 channels
Guest Wi-Fi
VLAN 40
rate limited
a camera breach cannot reach the finance PCs
Almost no network is badly designed on day one. They decay:
A department moves and someone drops in an unmanaged switch. A camera system goes in on the office VLAN because it was quicker. An access point gets added where there is a spare port rather than where the coverage gap is. Three years of that, and nobody can say with confidence what is plugged into what.
The result is a network where every problem takes a day to diagnose, because the first hour is spent working out how it is wired.
Every engagement starts with a survey: physical walk, switch port audit, traffic capture, Wi-Fi measurement. You get a picture of what is installed, which is reliably different from what people believe is installed.
Topology, addressing, segmentation and QoS get decided and signed off before procurement. Changing a diagram costs nothing; changing a rack costs a weekend.
Production machines, cameras, guest Wi-Fi, staff and card payments each get their own segment, with rules between them. On most sites it removes more risk than anything else we could do, and it is mostly configuration, not hardware.
Wi-Fi coverage gets verified with a post-installation survey in the aisles where the work happens. Cable runs get tested and certified. Throughput gets proven against the numbers in the design. If it does not hit the spec, it is not finished.
A resilient network on unprotected power is not resilient. We size UPS capacity against measured load rather than nameplate ratings, plan cooling for the rack density you are building to, and put physical access control on the door.
The deliverables list above is not aspirational. It is what you receive, and it is what makes the difference between an estate you own and an estate that owns whoever installed it.
You receive
Who this is for
How it starts
A site survey and network read: we map what is actually installed, find the bottlenecks, and give you a prioritised plan with costs.
Start hereYes, and it is how most of our infrastructure work is done. Changes are staged, scheduled into windows you approve, and every cutover has a tested rollback prepared before we start. If a step needs downtime we tell you the window and duration in advance.