Skip to content
Services

Eight service lines. One team owns the outcome.

Buy one. Most customers end up buying several.

Coverage map
  • BuildSoftware, ERP
  • Run for youYour back office, our team
  • InfrastructureNetworks, security, cloud
  • SupportEmail, managed IT

Software Engineering

6–20 weeks depending on scope

Web, mobile and desktop systems built around your process, not the other way round

What it changes

  • Replace the spreadsheet that three people maintain and nobody trusts
  • Cut a manual process from hours to minutes without retraining everyone
  • Give management numbers that are current, not last month's

Covers

  • Web applications
  • Mobile applications
  • Desktop applications
  • Systems integration
  • Legacy modernisation

Where it starts: A paid two-week discovery: process mapping, data audit, and a fixed-price build proposal you are free to take elsewhere.

Odoo

Odoo ERP

8–14 weeks for one company. 4–6 months for manufacturing or several companies

One system for sales, purchasing, stock, manufacturing and accounting: live in weeks, not years

What it changes

  • Figures that are current when you look at them, not when someone gets round to compiling them
  • Stock figures the branch manager and the warehouse both believe
  • One purchase order trail from request to payment

Covers

  • Implementation
  • Manufacturing
  • Custom modules
  • Migration and version upgrades
  • Integration

Where it starts: A two-week fit assessment: we map your processes onto standard Odoo and report on what fits, what needs building, and what you should change instead of customising.

Managed Operations

3–6 weeks to build the system and run the first cycle. Fully running by month two or three

We build your Odoo, then our team runs the daily work on it: accounting only, or the whole operation

What it changes

  • A month that closes on a date you can plan around, because the entry is done daily rather than in a panic
  • Back-office work delivered at a fraction of the cost of the same seats hired locally
  • No recruitment, no visas and no scramble to cover annual leave

Covers

  • The system comes first
  • Accounting operations
  • Sales and purchase operations
  • Inventory and logistics paperwork
  • Payroll and HR records

Where it starts: A one-week process read. We list every recurring task, who does it today, how long it takes and what it would cost run from our side, and you keep that document whether or not you continue.

Networks & Infrastructure

A switch and Wi-Fi refresh takes under a week. New cabling across a multi-floor site, 3–8 weeks

LAN, WAN, Wi-Fi, structured cabling and servers: designed, documented and handed over

What it changes

  • Wi-Fi that works in the warehouse, not just near the office
  • A network diagram that matches reality
  • Failures that are isolated instead of taking the site down

Covers

  • Network design
  • Structured cabling
  • Enterprise Wi-Fi
  • Server rooms
  • Segmentation and access

Where it starts: A site survey and network read: we map what is actually installed, find the bottlenecks, and give you a prioritised plan with costs.

Cybersecurity

Assessment in 2–5 days. Hardening takes a day to three weeks, depending on the size of the estate

Hardening, segmentation, endpoint control and incident response: sized for companies without a security team

What it changes

  • A ransomware event becomes an inconvenience instead of an extinction
  • Backups that have actually been restored, not just scheduled
  • One compromised laptop stays one compromised laptop

Covers

  • Security assessment
  • Perimeter and firewalls
  • Endpoint protection
  • Backup and recovery
  • Identity and access

Where it starts: A fixed-price security assessment. You get a ranked findings report you can act on with or without us.

Cloud & Hosting

One workload moves in under a week. A full estate with tested disaster recovery takes 4–10 weeks

Architecture, migration and hosting decided by your constraints, not by a vendor's roadmap

What it changes

  • Running cost you can forecast instead of a bill that surprises you
  • Capacity that grows without a procurement cycle
  • Recovery measured in hours, with the test to prove it

Covers

  • Architecture and sizing
  • Migration
  • Hybrid deployments
  • Servers and virtualisation
  • Backup and disaster recovery

Where it starts: A hosting assessment: measured load, a costed comparison of cloud against on-premise against hybrid, and a recommendation with the reasoning shown.

Business Email & Workspace

One to eight hours. An hour for a new domain, a working day if mailboxes need moving

Domain email, shared collaboration and the anti-phishing records almost nobody sets up

What it changes

  • Your own domain on every invoice, not a free mailbox
  • A signature that reads name@yourcompany.com, not a gmail address
  • Mail that reaches the inbox instead of the spam folder

Covers

  • Microsoft 365 and Google Workspace
  • Deliverability
  • Shared drives and collaboration
  • Distribution lists and shared mailboxes
  • Security baseline

Where it starts: A mail health check: we read your DNS, deliverability and current setup, and report what is exposed. Free, and takes us an afternoon.

Managed IT & Support

Onboarding in 2–3 weeks, then ongoing

Monitoring, patching and backups, with one engineer who knows your systems by heart

What it changes

  • Problems found by monitoring before a user reports them
  • One number to call instead of four vendors blaming each other
  • Predictable monthly cost instead of emergency invoices

Covers

  • Proactive monitoring
  • Patch management
  • Helpdesk
  • Backup verification
  • Asset and licence management

Where it starts: An estate audit: we document what you run, what state it is in, and what the risks are. It becomes the baseline for the contract, and it is yours whether or not you sign.

Side by side

Which one do you need? Compare them.

Regardless of the line

The same four stages, every time

An afternoon on a mail cutover or four months on a manufacturing ERP — same shape.

  1. 01

    Discover

    Half a day to a week

    We sit with the people who use the system, walk the site, and read the network. No proposal before we understand how the work is done today and where it breaks.

  2. 02

    Design

    A day to two weeks

    Architecture, data model, network topology and rollout order — decided before anyone writes code or pulls cable. You approve the plan and the number attached to it.

  3. 03

    Build & deploy

    A day to sixteen weeks

    On a build, two-week increments with something you can click on at the end of each. On infrastructure, staged so the business never stops for us — and on a small job, done in a sitting.

  4. 04

    Run & improve

    Ongoing

    Monitoring, patching, backups and a named engineer who already knows your estate. The people who built it are the people who answer the phone.

Wide ranges, because the same four stages cover a mail setup and a full ERP. Each service page has its own numbers.

Not sure which line you need

Describe the problem. We will tell you which service it is — or that it is none of them.

Plenty of enquiries need a setting changed, not a project.

  • A reply within one working dayFrom an engineer.
  • We look before we quoteA call, and a site visit if needed.
  • The recommendation is yoursYours to take elsewhere.
  • Or call +20 109 777 8090